Amin Chelongar

Electrical Engineer

Power engineering engineer with 9 years experience in post and power plant (hydroelectricity) and familiarity with control equipment, instrumentation and protection, Electrical supervision expert of power plant and steel industries, technical expert, specialist and executor in the field of planned maintenance and repair (CMMS)

Education

Master Electricity

Branch Power Electric

Institute/University: Islamic Azad University, Khomeini Branch of Isfahan

Bachelor Electricity

Branch Power Electric

Institute/University: Islamic Azad University, Khomeini Branch of Isfahan

Associate Electricity

Branch Post & Powerhouse

Institute/University: Islamic Azad University, Khomeini Branch of Isfahan

Skills

Record reports and presentations

80%

Repair and maintenance

80%

PSIM Simulation

60%

PLC LOGO Siemens

80%

SQL Server

60%

AutoCAD

60%

plc step7

60%

MATLAB

60%

Has a fan-talk in the presentation of content

80%

microsoft windows

80%

PSCAD Software

60%

EPLAN Electric P8

60%

project planning and control

60%

stimolsoftreport

60%

Power of analysis

80%

Photoshop

60%

Provide scientific and technical content

80%

Research and research

80%

Word-Excel-PowerPoint

80%

Generator Test

80%

Transformator Test

80%

Repair / Troubleshooting

80%

Coding equipment and warehouse

80%

Implementation of mechanized repair and maintenance system

100%

Electromotor test

80%

Understanding instrumentation tools

80%

Electricity supervision of power plants and steel industries

80%

Work Experience

Electric Repair Technician

Iran Water and Power Organization

Technical expert (control, instrumentation and protection)

Iran Water and Power Organization

Head of CMMS Working Group and Archives

Iran Water and Power Organization

Executive Supervisor

PARSE

Administration Manager

PARSE

Maintenance Manager

Isfahan Metro Company

Head of systems and methods improvement

Isfahan Metro Company

Electrical supervisor expert

Mobarake Steel Technical and Engineering Company of Isfahan

Language

English

Reading

60%

Writing

40%

Speaking

60%

Listening

40%

Projects

Title Project: Participation in the design and maintenance of a planned maintenance and repair system (CMMS)

Description: The project was launched by Iran Water and Power Resources Development Company (Karun 4 Dam and Power Plant), which was first introduced in Iran and among hydroelectric plants, and was unveiled in February 2013.

Title Project: Supervisor of the Project Implementation Team for the planned maintenance and coding system of Parse Corporation

Description: This project was requested by Kaveh Arvand Steel Company for the implementation of equipment encoding (storage, parts, devices, systems, organization, etc.) and for the planning of maintenance and repair of the rolling line of the rebar and wire.

Title Project: Project Manager of Planned Maintenance and Coding System Project

Description: This project was carried out at the request of Isfahan metro company for installation, commissioning, training and consulting on the comprehensive Isfahan metro system.

Title Project: Supervision of the electricity department of the 1000 MW Class F combined cycle power plant project in the south of Isfahan

Description: In order to sustainably supply Mobarakeh Fould electricity and reduce dependence on the grid, the construction project of the Mobarakeh Fould combined cycle power plant was defined and a contract of 415 million euros was signed with Mapna as the project contractor.This power plant consists of two gas units with a nominal capacity of 307 MW each and a steam unit with a nominal capacity of 300 MW, the total nominal capacity of which is 914 MW.The said power plant will be built on a land of more than 12 hectares on the west side of Shahid Kharazi substation, and its advantage over the previous Foulad power plant is its high efficiency. The gas units with Siemens class F turbine have an efficiency of 38%, the heat from the exhaust gas of the gas turbine in recycled boilers produces superheat steam and the produced steam drives the steam turbogenerator, while it should be noted that the steam unit without fuel consumption is able to It produces electricity and will bring the total efficiency of the power plant to 56%.

Certificates

Extending the second and second floor industrial electricity and building power

Institute: Isfahan Technical School

Pass the AUTO CAD training course

Institute: Isfahan Municipality School

Conducting a computer and operating system training course

Institute: Isfahan Municipality School

Take the training course using Pars Company software and similar software for the CMMS system

Institute: Center for Logistics Studies and Research at Imam Hassan University (AS)

Take a course on how to log in with StimulSoft software from the SQL Server environment

Institute: Center for Logistics Studies and Research at Imam Hassan University (AS)

Pass SQL Server Software Training Course

Institute: Center for Logistics Studies and Research at Imam Hassan University (AS)

Pass the PLC S7 course (hardware and software)

Institute: Isfahan Kian Control School

Pass the training course for calculating and analyzing Key Maintenance and Maintenance Indicators (KPIs).

Institute: Center for Logistics Studies and Research at Imam Hassan University (AS)

To conduct a course on management of physical assets and maintenance and repairs

Institute: Center for Logistics Studies and Research at Imam Hassan University (AS)

Pass the Thermography course

Institute: Center for Logistics Studies and Research at Imam Hassan University (AS)

Pass the Root Cause Failure Analysis (RCFA) course.

Institute: Center for Logistics Studies and Research at Imam Hassan University (AS)

Hold a training course on planning and scheduling of maintenance activities

Institute: Center for Logistics Studies and Research at Imam Hassan University (AS)

Passing initial pre-primary and fire control courses

Institute: Neda Gostar Safety Institute

Familiar with Relay Equipment and Power Protection Equipment and Equipment

Institute: Isfahan Water and Power University

Pass the RCM course, CMMS

Institute: Iran Water and Power Organization

Pass RCA and RCFA courses

Institute: Iran Water and Power Organization

Training course on FMEA and CMMS

Institute: Iran Water and Power Organization

Pass the PLS-S7 training course

Institute: Arak Machine Manufacturing Co.

Basic and Advanced Hydraulic Training Course

Institute: Arak Machine Manufacturing Co.

Pass a training course on testing and maintaining power transmissions

Institute: Rastak Power Middle East

Pass the general instrument course

Institute: Iranian Research and Training Center

Pass the planning period for maintenance and repair of the power plant

Institute: Iran Water and Power Organization

Honors

Research

Thesis: Developing a tutorial on simulating power systems in Simulink matlab

Description: Related to the BS.

Thesis: Simultaneous positioning of capacitor banks and DG to enhance reliability and minimize power losses and voltage profiles using genetic algorithm.

Description: The master's thesis is the first time on the 118 Basset network and reliability calculations, losses, voltage profiles, and positioning simultaneously with the algorithm.

Paper: What are the conventional RCM implementation methods?

Publisher: Internet reliability magazine

Description: Reliability magazine is Iran's first dedicated Internet publication about maintenance and repair, physical assets and reliability in Iran, which I am working as a master of net designing with this magazine.

Paper: Certification and job performance

Publisher: Internet reliability magazine

Description: Reliability magazine is Iran's first dedicated Internet publication about maintenance and repair, physical assets and reliability in Iran, which I am working as a master of net designing with this magazine.

Paper: HV Shunt Reactor Switching (Checking and Analyzing the Problem of Keying the Karun 4 Power Plant Reactor)

Description: This article was submitted to the Iranian Water and Power Organization.

Paper: Intelligent reliability calculations along with the location of distributed generation sources with different algorithms

Description: It is completing and submitting an article for ISI

Paper: Investigating the effects of capacitor space and distributed generation resources on distributed networks (radial networks with high bass) and checking network parameters on it (reliability, loss recovery, improvement of voltage profile, etc.)

Description: It is completing and submitting an article for ISI

Contact